End of Service Benefits Valuation Software in Saudi Arabia Designed Around IAS 19

End of service benefits valuation software in Saudi Arabia converts a company's Labor Law obligations into an IAS 19 liability in riyals. Prima's tool reads your staff census, suggests assumptions from the data and delivers a signed report that your finance team can hand straight to the auditor.

Prima's actuaries wrote this software for their own benefits assignments.

Those same actuaries designed the engine you would be using.

Why Finance Teams in the Kingdom Need End of Service Benefits Valuation Software

End of service benefits valuation software is a calculation platform that estimates what an employer will pay each worker on exit, spreads the cost across future years and restates it in today’s riyals as the IAS 19 defined benefit obligation.
Saudi payroll systems already compute the Labor Law award for a leaver on a given day. That is a payment figure, whereas the financial statements need a measured obligation for the whole workforce. Auditors list this gap among the common IAS 19 valuation mistakes.
  • The EOSB spreadsheet is understood by exactly one analyst
  • Our auditor wants evidence before the SAR reporting date
  • Another assumption tweak, another consultant bill
  • Salary files are emailed outside the company
  • Nobody can explain how last year’s liability was reached
  • A misplaced cell can alter the balance unnoticed
Test it on a trimmed copy of your own staff list
Ledger and desk lamp for end of service benefits valuation software in Saudi Arabia

An IAS 19 Engine to Replace Your EOSB Spreadsheet

An EOSB spreadsheet is only as reliable as its author. This tool gives the whole team one engine to rely on.

Prima’s end of service benefits valuation software in Saudi Arabia runs inside your own systems. Import the staff list, check the assumptions it suggests and download a signed report in the same session.

  • Importing a census yields the obligation under the Projected Unit Credit method.
  • The assumptions module suggests rates from your headcount history, and every rate stays editable.
  • Each reported figure links to the staff record that produced it.
  • Adjust an input and recalculate as often as you wish, with no extra fee.
  • No employee file is passed to an external consultant.
  • Prima’s actuaries configure Articles 84 and 85 of the Saudi Labor Law, including the resignation tiers, together with your own contract wording.

Five EOSB Problems This Software Settles for Saudi Employers

"Our EOSB spreadsheet is a single point of failure."

What your team needs A governed model that gives matching results for matching data every time.

How Prima helps The logic sits in one maintained engine rather than in an analyst's private file.

  • Fewer yearly rebuilds from old tabs
  • One Projected Unit Credit routine for every run
  • Coverage when the file's author is away

"Our auditor wants support before the SAR reporting date."

What your team needs A defensible valuation timed to your reporting calendar.

How Prima helps Your team produces the full valuation internally and holds a signed report within the session.

  • Reports ready in minutes during close
  • No outside backlog to wait behind
  • Room to challenge the numbers before fieldwork

"Every tweak to the SAR discount rate becomes a fresh project."

What your team needs A way to try different discount rate, pay and turnover inputs without paying for each trial.

How Prima helps Unlimited recalculation lets you adjust an input and regenerate the report at no extra fee.

  • Auditor-requested sensitivities on demand
  • No metering on what-if testing
  • An updated report as soon as inputs change

"Employee data goes to people who are not employees."

What your team needs To value benefits while national ID and salary details stay in-house.

How Prima helps Records are processed in your own environment instead of travelling to a consultant.

  • Wage and service data governed by your own rules
  • A smaller footprint for third-party data requests
  • An easier privacy conversation, PDPL obligations included

"Nobody can reproduce last year's liability."

What your team needs Prior figures that can be explained when an auditor returns to them.

How Prima helps Every run archives inputs and assumptions beside the result, so earlier numbers can be regenerated.

  • Earlier balances recreated on request
  • A documented line from census row to liability
  • Faster answers to audit questions

From Census to Signed Report: Valuing EOSB in Prima's Software

End of service benefits valuation software in Saudi Arabia replaces a weeks-long exercise with five guided stages. Each stage produces a defined output, so the work moves from raw HR data to a signed report on one platform.

Step 1:
Upload Data
Import the staff list. Automated checks flag missing joining dates, duplicate IDs and impossible birth dates before any calculation. OUTPUT: A census cleared for valuation.
>>>
Step 2:
Set Assumptions
The assumptions module reviews your workforce and proposes discount, salary and turnover inputs. Keep them or key in your own. OUTPUT: A frozen assumption set with its sources.
>>>
Step 3:
Run Valuation
The engine applies the Projected Unit Credit method and returns the obligation, service cost and interest cost per entity. OUTPUT: IAS 19 figures for each reporting entity.
>>>
Step 4:
Probe and Recalculate
Change an input, regenerate and compare the outcomes. Recalculation is unrestricted, so a what-if needs no approval. OUTPUT: Scenario results laid side by side.
>>>
Step 5:
Generate Report
A signed report arrives formatted for the notes to your statements, covering the movement analysis, the OCI split and all assumption disclosures. OUTPUT: A signed EOSB valuation report for the auditor.

Book a Demo of These Stages

Step 1
Import Data
Import the staff list. Automated checks flag missing joining dates, duplicate IDs and impossible birth dates before any calculation.
Step 2
Set Assumptions
The assumptions module reviews your workforce and proposes discount, salary and turnover inputs. Keep them or key in your own.
Step 3
Run Valuation
The engine applies the Projected Unit Credit method and returns the obligation, service cost and interest cost per entity.
Step 4
Probe and Recalculate
Change an input, regenerate and compare the outcomes. Recalculation is unrestricted, so a what-if needs no approval.
Step 5
Generate Report
A signed report arrives formatted for the notes to your statements, covering the movement analysis, the OCI split and all assumption disclosures.

What Our End of Service Benefits Valuation Software in Saudi Arabia Includes

Feature What It Means
Census Import With Integrity Checks Missing-field, duplicate and date checks stop unreliable records at the door.
Workforce-Based Assumption Suggestions Discount, salary and turnover inputs are proposed from your own headcount history, and each is overridable.
Projected Unit Credit Calculation Obligation, current service cost and interest cost are generated by the method IAS 19 requires.
Labor Law Terms Configured Prima's actuaries set up the Article 84 award, the Article 85 resignation tiers and any contract terms that go further.
Signed Reports Ready for Disclosure Reports contain the OCI split, movement analysis and assumption disclosures that reviewers expect.
Unrestricted Recalculation Edit an input and the whole valuation regenerates without a fee, for as many cycles as the audit demands.
Separate Valuation Per Entity Each subsidiary or division is valued individually while staying in one workspace.
Data Handled In-House Staff records are processed inside your environment, with no copy leaving for a consultant.
Oracle Cloud Hosting Hosting on Oracle Cloud Services is designed to meet Saudi CITC and PDPL requirements.
Actuary and Accountant Backing Qualified actuaries and accountants stand behind the software during the valuation and the audit.
Proof

Grounded in Genuine Benefits Valuation Assignments

Process Results

  • Data checks that took a working day by hand now complete as the file loads
IAS 19
Projected Unit Credit method, one auditable trail

Methodology and Standards

The method follows IAS 19 as written, with every step logged for external audit review. Prima's practising actuaries tailor each configuration to the entity's own end of service terms, and a single run produces the obligation, service cost and interest cost under Projected Unit Credit, the OCI split, the movement analysis and the assumption disclosures.

Audit files on a conference table for end of service benefits valuation software in Saudi Arabia

Spreadsheet or Software: The EOSB Comparison

Side by side, the two approaches differ most in the places an auditor looks first.

The spreadsheet approach The Prima software approach
One analyst holds the logic in their headThe calculation is documented in the platform and owned by the team
An external firm's calendar decides your timetableYour finance team completes the valuation and holds the signed report that day
A revised assumption restarts the quoting cycleRecalculation is unrestricted and costs nothing extra
Salary and ID data is attached to emailsThe data stays in your own environment
A wrong reference can distort the liability silentlyImport checks flag field, duplicate and date problems immediately
Prior-year numbers are lost once the file is overwrittenArchived inputs let any earlier result be regenerated
Resignation tiers are hand-coded and seldom revisitedPrima's actuaries configure the tiers once and test them against your contracts
The auditor asks for working and finds gapsEach report ships with its movement analysis, OCI split and assumption notes

A Valuation Team That Maintains Its Own Software

People sometimes assume consulting-firm software is an afterthought. In this case the actuaries are the users: they run IAS 19 assignments on the same engine you would receive, so defects surface in their work first. Prima's team stays reachable for discussions on IAS 19 assumptions, disclosure questions and meetings with your auditors. Teams choosing between models can compare outsourced and in-house actuarial work.

Where the Software Stands Today

In its current form the software measures liabilities deterministically under IAS 19 using Projected Unit Credit, with judgement left to the actuary. A single census can hold several scenarios, so testing a different assumption means changing a setting. Standard EOSB obligations do not require stochastic techniques, and exports stay clean for downstream use.

How Prima's Benefits Practice Produced the Software

Prima’s actuarial and accounting staff first performed IAS 19 valuations manually and kept meeting the same ceiling. Manual files cope with a few entities before faltering, and they seldom leave the trail that reviewers now request. The background is in Prima’s IAS 19 System V2 announcement.

In the Kingdom, SOCPA endorses the IFRS Accounting Standards that publicly accountable entities must follow, so end of service benefits are measured as a defined benefit obligation. Article 84 of the Labor Law provides half a month’s wage per year during the first five years and a full month’s wage per year beyond that, using the last wage. It is one input to the measurement, not a replacement for it.

Support carries on after go-live, with Prima’s actuarial and implementation staff available to your team. The software is the instrument, and its authors remain part of the Prima team. Where an independent check is needed, Prima also offers an auditor’s expert review.

Laptop and brass key for in-house data in end of service benefits valuation software in Saudi Arabia

Put End of Service Benefits Valuation Software in Saudi Arabia to Work at Your Next Close

The tool grew out of Prima's own EOSB assignments, so your finance team can prepare audit-ready valuations without waiting. A quarter-hour demo, hosted by an actuary, uses sample data.

Choosing any of the three places you under no obligation.

Related products from IFRS Tech: Delta for IFRS 17, Rust for IFRS 9 and ECL, Aegis for insurance reservingand ROU 360 for IFRS 16.

End of Service Benefits Valuation Software in Saudi Arabia: Your Questions Answered

It is a tool that turns Saudi end-of-service entitlements into an IAS 19 liability stated in riyals. The engine uses Projected Unit Credit on your staff data and produces a signed report suited to the notes of the financial statements.

Article 84 pays half a month's wage per year during the first five years and a full month's wage per year after that, using the last wage. Part years are paid in proportion. The software builds this rule into each projection.

Article 85 scales the award by service: nothing under two years, one third from two to five years, two thirds from five to ten years, and the full award from ten years. The tiers sit inside the leaver projection, so resignation and termination are valued differently.

SOCPA endorses the IFRS Standards for publicly accountable entities, and IAS 19 belongs to that set. Smaller companies use the IFRS for SMEs Standard as endorsed, which has its own section on employee benefits, unless they elect full IFRS.

A Labor Law award states what one leaver would receive on one day. IAS 19 values the expected future payments of the whole workforce, discounted to the reporting date, so the two totals normally differ.

The Labor Law uses the last wage, which covers basic pay and other due increases, and employer and worker may agree to exclude commissions and similar variable parts. The upload template keeps each pay component in its own column so your contracts can decide.

Yes. Every entity receives its own valuation in a shared workspace, so all subsidiaries follow one method while their figures stay separate.

The engine reads the exit history in your census and suggests a rate by age and service band. Your team can accept it or enter another, and the basis is recorded.

A calculator returns the award for one employee leaving today. This tool projects the whole workforce to future exit dates, discounts each payment and delivers the figures and notes an audit needs.

It is the discounted value of end of service benefits that current employees have already earned, estimated from assumptions about pay, exits and the discount rate.

Projected Unit Credit, which IAS 19 requires for defined benefit plans. Every year of service earns a unit of benefit, and the projected total is brought back to the reporting date.

Yes. They may receive little or nothing if they resign early, but IAS 19 weights their expected benefit by the chance of staying, so the model includes them with that probability.

IAS 19 paragraph 83 points to yields on high quality corporate bonds in the obligation's currency, with government bond yields as the fallback where that market lacks depth. The engine proposes a rate on that basis and logs its source.

A fund counts only when it is legally separate and meets the IAS 19 definition of plan assets. If awards are paid from company cash there are none, and the full obligation appears on the balance sheet.

A change in the statutory award alters the benefit formula, which Prima's actuaries update in the configuration before the next valuation. IAS 19's plan amendment rules then govern how the change is accounted for.

After a plan amendment, curtailment or settlement, IAS 19 asks for updated assumptions through the end of the period. You can recalculate on the new assumption set in the software.

The calculation sits in one maintained engine, so each cycle starts from the same logic. Import the staff list, review the assumptions and download the signed report, with no rebuild of last year's tabs.

Yes. HR supplies and confirms the staff list, finance approves the assumptions, and the guided stages keep both on the same record. Prima's actuaries are on hand for technical points.

A signed report containing the movement analysis, OCI split and assumption notes, plus a trail from each figure to its source row, so reviewers can test the numbers without rework.

Every suggested discount, pay and turnover input is a starting point that can be replaced. Recalculation is unlimited, so testing alternatives adds no cost.

Hosting is on Oracle Cloud Services and designed to meet Saudi CITC and PDPL requirements. Your IT and compliance leads should still review it against your own data policy before go-live.

Prima's actuaries use the same engine on live client work, and it came out of real EOSB assignments. Actuarial support is part of the package.

IAS 19 reporting for end of service benefits calls for a deterministic Projected Unit Credit result. A standard Saudi EOSB promise gives no reason for stochastic modelling.

Not directly. IAS 19 treats a plan with fixed employer contributions as a cost recognised when paid, while this software is built for defined benefit end of service promises.

A census listing date of birth, joining date, wage components and entitlement per covered employee. The template flags gaps on import, and a typical payroll extract supplies most of it.

An actuary runs one full valuation on sample data, takes your technical questions and shows the signed report. Nothing obliges you to continue.

Prima Consulting

Actuarial Advice With Dedicated Software

Contact Us

Use the form to tell us about your Saudi entities, end of service terms and reporting dates, and a Prima specialist will recommend a starting point for your end of service benefits valuation software in Saudi Arabia.

Your benefits:
What happens next?
1

A call is scheduled at your convenience

2

A discovery meeting follows

3

A proposal is sent to you

Schedule a Free Software Consultation